Skip to content

usb-camera-taytay — phase-2-slice-7: Implement MVP1-FS-007

Phase: phase-2: Functional requirements

Completed-file cleanup only after durable upload completion.

Live status is recorded in .sandbox-loom/implementation-status.yml; Sandbox Loom marks the runtime-selected slice in progress before implementation and records completion only after verification, approval, and a verified commit.

  • Source: requirements
  • Requirement: MVP1-FS-007
  • Acceptance criteria: Build the MVP1 fixture producer, filesystem observer, and Taytay adapter, including stable artifact publication, checksum verification, and durable-ledger integration.; After the Taytay ledger confirms Completed or Retained, move the matching checksum-verified source file and optional sidecar from input to archive; retain sources for all other ledger states.
  • Quality gates: declared_cargo_fmt, declared_cargo_check, declared_cargo_test, declared_cargo_llvm_cov, declared_cargo_clippy, declared_quality, declared_acceptance_mock, documentation_links, documentation_navigation, documentation_redaction, mermaid_validation, zensical_build
  • Commit required: true